As part of the renovation to the stage technology, optimizations were made to the room acoustics. By using ceiling resonators, the localization of the instrument groups were improved whilst the connection between the auditorium and the stage was also revamped. The monitoring of the musicians among each other was optimized by valuable “early reflections”.
Acoustics
We love theater.
Berlin Concert Hall – Ceiling Canopy
Berlin Concert Hall - Ceiling Canopy
Your contact persons

Ralf Bauer-Diefenbach
MMT-TLV LTD.
c/o OfficeTax Advisor Glam
10 Hirshenberg St.
61067 Tel Aviv
+49 30 31 01 72 21
info@mmt-network.de